Shanghai Hongqiao Railway Station
-
Project Location:
Shanghai
-
Project Background:
As a "zero-transfer" integrated transportation hub combining railway, aviation, metro, and six other modes of transport, Shanghai Hongqiao Railway Station features an above-track elevated waiting hall and below-track arrival structure, with a total floor area exceeding 240,000 square meters. It undertakes the critical task of passenger flow management for multiple high-speed rail trunk lines including the Beijing-Shanghai and Shanghai-Kunming lines. To ensure long-term safe operation, special remediation of concrete durability deterioration has been carried out, and systematic upgrades have been implemented to enhance structural stability.
-
Strengthening Construction Period:
2018
-
Strengthening Method:
Carbon fiber reinforcement, anchoring reinforcement (rebar planting)
-
Material Selection:
Horse Carbon Fiber Sheet, Horse Carbon Fiber Impregnating Adhesive, Horse Injection-Type Anchoring Adhesive.