info@shhorse.com +86 18116327159

Shanghai Hongqiao Railway Station

  • Project Location:

    Shanghai

  • Project Background:

    As a "zero-transfer" integrated transportation hub combining railway, aviation, metro, and six other modes of transport, Shanghai Hongqiao Railway Station features an above-track elevated waiting hall and below-track arrival structure, with a total floor area exceeding 240,000 square meters. It undertakes the critical task of passenger flow management for multiple high-speed rail trunk lines including the Beijing-Shanghai and Shanghai-Kunming lines. To ensure long-term safe operation, special remediation of concrete durability deterioration has been carried out, and systematic upgrades have been implemented to enhance structural stability.

  • Strengthening Construction Period:

    2018

  • Strengthening Method:

    Carbon fiber reinforcement, anchoring reinforcement (rebar planting)

  • Material Selection:

    Horse Carbon Fiber Sheet, Horse Carbon Fiber Impregnating Adhesive, Horse Injection-Type Anchoring Adhesive.

Contact Us

Name*

E-Mail*

Country*

Phone/Whatapp*

Please leave your demands here, we will contact with you later

By submitting your information, you agree to the Privacy Policy.