Rehabilitation Hospital at the Former Site of Shunde Hospital, Southern Medical University
-
Project Location:
Guangzhou
-
Project Background:
# English Translation
Construction Works of Rehabilitation Hospital (Geriatric Hospital) and Integrated Medical-elderly Care Project at the Former Site of Shunde Hospital, Southern Medical University (Section 1) and Supporting Elevator Facilities Project
The construction scope covers secondary structural reinforcement, architectural decoration and installation works of Building 1, Building 2 and the canteen; fire control room works (1st floor of Building 3); construction and installation works for fire pump house and water supply pump house; construction and installation works of sewage treatment station; construction and installation works for power capacity expansion of power distribution room; decoration and installation works of clinical laboratory; construction and installation works of central oxygen supply station (including medical gas system, excluding Building 3, 4 and 5); outdoor installation works and landscape engineering. -
Strengthening Construction Period:
2024
-
Strengthening Method:
Carbon fiber reinforcement, rebar anchoring reinforcement
-
Material Selection:
HORSE Carbon Fiber Fabric, HORSE Carbon Fiber Impregnating Adhesive, HORSE Injectable Rebar Anchoring Adhesive