Yongyang New Energy Wuhe Green Energy Base
-
Project Location:
Bengbu
-
Project Background:
The Wuhe County Wind-Solar-Storage Integrated Base Project in Bengbu City is located in Wuqiao Town and Shuangzhongmiao Town. The project plans for a wind and solar power installed capacity of 2,000 MW, with a supporting energy storage scale of 540 MW/1.08 GWh. It is planned that by 2024, the installed wind and solar capacity will reach 1,200 MW, with supporting energy storage of 324 MW/648 MWh.
-
Strengthening Construction Period:
2023
-
Strengthening Method:
Precast segmental splicing reinforcement
-
Material Selection:
Horse Precast Segmental Construction Adhesive