Shenyang Taoxian International Airport.
-
Project Location:
Shenyang.
-
Project Background:
Shenyang Taoxian International Airport, as the core aviation hub of Northeast China, with increasing operational years and rising annual passenger throughput, faces issues such as insufficient load-bearing capacity and durability degradation in some existing structures. To ensure aviation safety and enhance the service level of the hub, a special engineering reinforcement project has been initiated.
-
Strengthening Construction Period:
2016
-
Strengthening Method:
Carbon fiber reinforcement
-
Material Selection:
Horse Carbon Fiber Sheet, Horse Carbon Fiber Impregnating Adhesive