info@shhorse.com +86 18116327159

Fengman Hydropower Station Comprehensive Rehabilitation (Reconstruction) Project

  • Project Location:

    Jilin

  • Project Background:

    Fengman Hydropower Station is located on the Songhua River in Jilin City, Jilin Province, China. Construction began in 1937, making it one of the earliest large-scale hydropower stations in Asia and earning it the reputation of the "Mother of China's Hydropower." The original dam was a concrete gravity dam, 1,080 meters long with a maximum height of 91.7 meters. After nearly 80 years of operation, it played a vital role in flood control, power generation, irrigation, and ecological water supply. However, due to multiple factors including historical construction constraints, material aging, frequent freeze-thaw cycles (severe winters in Jilin), ongoing alkali-aggregate reaction (AAR) development, and upgraded seismic standards, the structural safety risks of the old dam have become increasingly prominent. Based on project requirements, regional cooperation practices, and Horse's proven applications in high-cold hydropower projects, Horse has been selected as the supplier of reinforcement materials.

  • Strengthening Construction Period:

    2014

  • Strengthening Method:

    Anchoring reinforcement (rebar planting), crack repair and reinforcement

  • Material Selection:

    Horse Crack Injection Adhesive, Horse Injection-Type Anchoring Adhesive

Contact Us

Name*

E-Mail*

Country*

Phone/Whatapp*

Please leave your demands here, we will contact with you later

By submitting your information, you agree to the Privacy Policy.